The Eugene School District 4J encourages public contracting competition that supports openness and impartiality to the maximum extent possible and provides a variety of services responsive to the needs and challenges of schools and departments in their mission to provide a quality education to students.
Subject to Oregon Revised Statutes Chapters 279A, 279B, 279C and the District’s Public Contracting Rules, all public contracts shall be based upon competitive quotes, bids, or request for proposal, except where specifically exempt.
The list below is showing all bids, quotes and proposal categories (Construction, Property Lease, Services, Supplies and Technology) and may not include every 4J bid/quote opportunity. Additional opportunities may be found at OregonBuys.
- 
        NAME: 
 Arts & Technology Academy Gym Seismic Improvements
 CIP#: 463-911-P0121Bid Due Date: 
 Thursday, November 20, 2025 2:00 pm (standard pacific time)Non-Mandatory Pre-Bid: 
 A non-mandatory pre-bid conference has been scheduled for Wednesday, November 5, 2025 at 2:00 p.m. at Arts &
 Technology Academy, 1650 W. 22nd Ave. Eugene, OR front office area.Addenda: 
 Document Uploads Arts & Technology Academy Gym Seismic Improvements Project Manual Est. Const. Cost: 
 2.6 milStatus: 
 ActiveQuestions: Contact Project Manager, Danny Palanuk, palanuk_d@4j.lane.edu Hard copies are not provided by the School District. It is the responsibility of all Prime Bidders, Sub-bidders, and Suppliers to obtain Bidding Documents and all Addenda from the hyperlink. It is important that all bidders correctly indicate all addenda on the bid form. 
- 
        NAME: 
 Adams Elementary School HVAC UpgradesBid Due Date: 
 Tuesday, October 21, 2025 at 2:00 pmMandatory Pre-Bid Date A mandatory pre-bid conference and walk-through has been scheduled for Wednesday, October 8, 2025, at 3:30 
 p.m. The location of the conference will be in front of the school 950 W. 22nd Avenue, Eugene, Oregon.Addenda: 1 Document Uploads Adams Elementary HVAC Upgrades FINAL Bid Results Adams Elementary School HVAC Upgrades Project Preliminary Bid Results Adams Elementary School HVAC Upgrades Project Manual Adams Elementary School HVAC Upgrades Addendum 1 Est. Const. Cost: 
 N/AStatus: 
 PendingQuestions: Contact Project Manager, Kirk Gebb, gebb@4j.lane.edu Hard copies are not provided by the School District. It is the responsibility of all Prime Bidders, Sub-bidders, and Suppliers to obtain Bidding Documents and all Addenda from the hyperlink. It is important that all bidders correctly indicate all addenda on the bid form. 
- 
        NAME: 
 Multi-Site Covered Play StructuresBid Due Date: 
 October 7, 2025 at 2:00 p.m.Non-Mandatory Pre-Bid: 
 A pre-bid meeting will be held on Monday, September 22, 2025 at 10:00 a.m. at the District
 4J Facilities Offices, located at 715 West 4th Avenue, Eugene, Oregon.Addenda: 3 
 Document Uploads First-Tier Subcontractor Disclosure Forms Final Bid Results (Revised 10.10.25) Multi-Site Covered Play Structures Addendum No. 3 Multi-Site Covered Play Structures Addendum No. 2 Multi-Site Playground Structure Pre-Bid Sign-in Sheet Multi-Site Covered Play Structures Addendum No. One Multi-Site Covered Play Structures Project Manual Multi-Site Covered Play Structures Drawings Est. Const. Cost: 
 N/AStatus: 
 ClosedAward Date: October 15, 2025 
 Contractor: 2G Construction
 Contract Amount: $2,677,512.00
 Completion Date: August 2026Questions: Contact Project Manager, Danny Palanuk, palanuk_d@4j.lane.edu Hard copies are not provided by the School District. It is the responsibility of all Prime Bidders, Sub-bidders, and Suppliers to obtain Bidding Documents and all Addenda from the hyperlink. It is important that all bidders correctly indicate all addenda on the bid form. 
- 
        NAME: 
 Requests for Proposals for Professional Services for the Design of District 4J Multi-Site Cooling Retrofits ProjectBid Due Date: 
 Thursday, August 28, 2025 at 12:00 noonMandatory Pre-Proposal Meeting Date: 
 August 20, 2025 at 10:00am at District 4J Facilities Office, located at 715 W. Fourth AvenueAddenda: 2 Document Uploads: Multi-Site Cooling Retrofits Project Addendum No. Two 4J Multi-Site Cooling Retrofits Project Addendum No. One RFP 4J Multi-Site Cooling Retrofits Est. Const. Cost: 
 N/AStatus: 
 AwardedSystems West Engineering Questions: Contact Project Manager, Kirk Gebb at gebb@4j.lane.edu Hard copies are not provided by the School District. It is the responsibility of all Prime Bidders, Sub-bidders, and Suppliers to obtain Bidding Documents and all Addenda from the hyperlink. It is important that all bidders correctly indicate all addenda on the bid form. 
- 
        NAME: 
 Request for Statements of Qualification for Architectural Services for the Design of: 4J Education Center Production KitchenReturn by Date: July 3, 2025 
 Mandatory Pre-Bid Date: 
 N/ANon-Mandatory Pre-Bid: 
 A non-mandatory on-site meeting is scheduled for June 24, 2025 at 1PM at 4J Education Center,
 200 N. Monroe St at the SouthEast parking lot main entry.Addenda: 
 1Document Uploads RFQ 4J Education Center Production Kitchen Addendum No. One 
 RFQ 4J Education Center Production KitchenEst. Const. Cost: 
 N/AStatus: 
 PendingQuestions: Questions or comments pertaining to this RFQ should be raised in written form by noon, June 25, 2025. 
 Electronic questions should be emailed to CIP@4j.lane.edu.Hard copies are not provided by the School District. It is the responsibility of all Prime Bidders, Sub-bidders, and Suppliers to obtain Bidding Documents and all Addenda from the hyperlink. It is important that all bidders correctly indicate all addenda on the bid form. 
- 
        NAME: 
 Request for Statements of Qualification for Architectural Services for the Design of: 4J South Eugene Window Replacement ProjectReturn by Date: 
 July 7, 2025Mandatory Pre-Bid Date: 
 N/ANon-Mandatory Pre-Bid: 
 A non-mandatory site walk is scheduled for June 24, 2025, 10:00am at South Eugene High School.Addenda: 
 1Document Uploads RFQ SEHS Window Replacement Project Addendum No. One RFQ SEHS Window Replacement Project Status: 
 ClosedAwarded to: Robertson Sherwood Architects 
 Date: 8-26-2025Questions: Questions or comments pertaining to this RFQ should be raised in written form by noon, June 25, 2025. Email questions to CIP@4j.lane.edu Hard copies are not provided by the School District. It is the responsibility of all Prime Bidders, Sub-bidders, and Suppliers to obtain Bidding Documents and all Addenda from the hyperlink. It is important that all bidders correctly indicate all addenda on the bid form. 
- 
        NAME: 
 Multi-Site Trash Compactors – 2025Bid Due Date (Revised): 
 Wednesday, April 16, 2025 – 2:30 p.m.Mandatory Pre-Bid Date (Revised time): A mandatory pre-bid conference and walk-through has been scheduled for April 3, 2025 at 4:00 p.m. The location 
 of the conference will be in front of the school at Buena Vista Elementary School, 1500 Queens Way, Eugene,
 Oregon. Statements made by the District’s representatives at the conference are not binding upon the District unless
 confirmed by Written Addendum. Pre-qualification of bidders is not required.Addenda: 
 2Document Uploads Multi Site Trash Compactors 2025 Final Bid Results Multi Site Trash Compactors 2025 Preliminary Bid Results Multi Site Trash Compactors 2025 Addendum No. 02 Multi Site Trash Compactors 2025 Addendum No. 01 Multi Site Trash Compactors 2025 Project Manual Multi Site Trash Compactors 2025 Drawings Est. Const. Cost: 
 N/AStatus: 
 ClosedAward Date: April 24, 2025 
 Contractor: Ordell Construction
 Contract Amount: $519,018.00
 Completion Date: August 15, 2025Questions: Contact Project Manager, Kirk Gebb at gebb@4j.lane.edu Hard copies are not provided by the School District. It is the responsibility of all Prime Bidders, Sub-bidders, and Suppliers to obtain Bidding Documents and all Addenda from the hyperlink. It is important that all bidders correctly indicate all addenda on the bid form. 
- 
        NAME: 
 Multi-Site Parking & Accessible Path UpgradesBid Due Date: 
 Wednesday, April 16, 2025 2:00 pm local timeNon-Mandatory Pre-Bid: 
 A non-mandatory pre-bid conference and walk-through has been scheduled for April 9, 2025 at 2:00 p.m. The
 location of the conference will be in front of the school at Monroe Middle School, 2800 Bailey Ln, Eugene, Or.
 97401. Statements made by the District’s representatives at the conference are not binding upon the District
 unless confirmed by Written Addendum. Pre-qualification of bidders is not required.Addenda: 
 1Document Uploads Multi-Site Parking & Accessible Path Upgrades Final Bid Results Multi-Site Parking & Accessible Path Upgrades Preliminary Bid Results Multi-Site Parking & Accessible Path Upgrades Addendum No. 1 Multi-Site Parking & Accessible Path Upgrades Project Manual Multi-Site Parking & Accessible Path Upgrades Drawings Est. Const. Cost: 
 N/AStatus: 
 AwardedAward Date: April 25, 2025 
 Contractor: AB Utility Contractors, Inc.
 Contract Amount: $575,965.00
 Completion Date: August 18, 2025Questions: Contact Project Manager, Danny Palanuk at palanuk_d@4j.lane.edu Hard copies are not provided by the School District. It is the responsibility of all Prime Bidders, Sub-bidders, and Suppliers to obtain Bidding Documents and all Addenda from the hyperlink. It is important that all bidders correctly indicate all addenda on the bid form. 
- 
        NAME: 
 Churchill High School Installation of AC Replacements ProjectBid Due Date: 
 Wednesday, April 2, 2025 at 1:00 pm local timeMandatory Pre-Bid Date: A mandatory pre-bid conference and walk-through has been scheduled for March 19, 2025 at 3:00 p.m. The 
 location of the conference will be in front of the school at 1850 Bailey Hill Rd. Statements made by the District’s
 representatives at the conference are notAddenda: 2 
 Document Uploads Churchill HS Installation of AC Replacements Project Final Bid Results Churchill High School Installation of AC Replacements Preliminary Bid Results Churchill High School Installation of AC Replacements Addendum No 2 Churchill High School Installation of AC Replacements Addendum No 1 Churchill High School Installation of AC Replacements Pre-Bid Conference Sign-In Sheet Churchill HS Installation of AC Replacements Project Manual, Specs, & Drawings Est. Const. Cost: 
 100kStatus: 
 ClosedAward Date: April 14, 2025 
 Contractor: FM Sheet Metal, Inc.
 Contract Amount: $137,200.00
 Completion Date: August 15, 2025Questions: Contact Project Manager, Kirk Gebb at gebb@4j.lane.edu or Engineer, Gene Johnson at genej@solarc-eng.com Hard copies are not provided by the School District. It is the responsibility of all Prime Bidders, Sub-bidders, and Suppliers to obtain Bidding Documents and all Addenda from the hyperlink. It is important that all bidders correctly indicate all addenda on the bid form. 
- 
        NAME: 
 Multi-Site Slurry Sealing ProjectBid Due Date: 
 Thursday, March 20, 2025 at 2:00 pmMandatory Pre-Bid Date: 
 N/ANon-Mandatory Pre-Bid: 
 A non-mandatory pre-bid conference and walk-through has been scheduled for Monday, March 10th at 1:00 p.m.
 The location of the conference will be at 4J Facilities Conference Room Statements made by the District’s
 representatives at the conference are not binding upon the District unless confirmed by Written Addendum. Prequalification
 of bidders is not required.Addenda: 
 Document Uploads Multi-Site Slurry Sealing Bid Results Multi-Site Slurry Sealing Project Pre-Bid Conference Sign-In Sheet Multi-Site Slurry Sealing Project Manual Multi-Site Slurry Sealing Project Drawings Est. Const. Cost: 
 $700,000Status: 
 ClosedAward Date: April 3, 2025 
 Contractor: Pave Northwest
 Contract Amount: $95,500.00
 Completion Date: August 15, 2025Questions: Contact Project Manager, Kirk Gebb at gebb@4j.lane.edu Hard copies are not provided by the School District. It is the responsibility of all Prime Bidders, Sub-bidders, and Suppliers to obtain Bidding Documents and all Addenda from the hyperlink. It is important that all bidders correctly indicate all addenda on the bid form. 
- 
        NAME: 
 Multi-Site Pavement ReplacementRevised Bid Due Date: 
 Wednesday, March 26, 2025 at 2:00 pmMandatory Pre-Bid Date: 
 A mandatory pre-bid conference and walk-through has been scheduled for Thursday, March 6, 2025 at 1:00 p.m.
 The location of the conference will be the southwest parking lot at Churchill High School at 1850 Bailey Hill Road,
 Eugene, OR. Statements made by the District’s representatives at the conference are not binding upon the District
 unless confirmed by Written Addendum. Pre-qualification of bidders is not required.Addenda: 
 4Document Uploads Multi-Site Pavement Replacement Final Bid Results Multi-Site Pavement Replacement Preliminary Bid Results Multi-Site Pavement Replacement Addendum No. 04 Multi-Site Pavement Replacement Addendum No. 03 Multi-Site Pavement Replacement Addendum No. 02 Multi-Site Pavement Replacement Addendum No. 01 
 Multi-Site Pavement Replacement Pre-Bid Conference Sign-In SheetMulti-Site Pavement Replacement Project Manual Multi-Site Pavement Replacement Drawings Est. Const. Cost: 
 1.3 milStatus: 
 ClosedAward Date: April 3, 2025 
 Contractor: Delta Construction Co.
 Contract Amount: $805,071.00
 Completion Date: August 15, 2025Questions: Contact Project Manager, Kirk Gebb at gebb@4j.lane.edu Hard copies are not provided by the School District. It is the responsibility of all Prime Bidders, Sub-bidders, and Suppliers to obtain Bidding Documents and all Addenda from the hyperlink. It is important that all bidders correctly indicate all addenda on the bid form. 
- 
        NAME: 
 Coburg Elementary School Roof Replacement CIP No. 462-955-P0120Revised Bid Due Date: 
 Tuesday, March 25, 2025 at 2:00 pm local timeMandatory Pre-Bid Date: 
 N/ANon-Mandatory Pre-Bid: 
 A non-mandatory pre-bid conference and walk-through has been scheduled for Wednesday, February 26, 2025 at
 3:00 p.m. The location of the conference will be in front of the school at 91274 North Coburg Road.Addenda: 
 1Document Uploads Coburg ES Roof Replacement FINAL Bid Tally Sheet Coburg ES Roof Replacement Preliminary Bid Results Coburg ES Roof Replacement Addendum No. 01 Coburg ES Roof Replacement Pre-Bid Conference Sign-In 
 Coburg Elementary School Roof Replacement Project Manual
 Coburg Elementary School Roof Replacement DrawingsEst. Const. Cost: 
 1.5 millionStatus: Award Date: April 21, 2025 
 Contractor: Roof Toppers, Inc.
 Contract Amount: $1,407,837.00
 Completion Date: August 15, 2025Questions: Contact Project Manager, Danny Palanuk at palanuk_d@4j.lane.edu Hard copies are not provided by the School District. It is the responsibility of all Prime Bidders, Sub-bidders, and Suppliers to obtain Bidding Documents and all Addenda from the hyperlink. It is important that all bidders correctly indicate all addenda on the bid form. 
- 
        NAME: 
 South Eugene High School Softball Field Drainage RepairBid Due Date: 
 Tuesday, February 25, 2025 until 12:00 pm (noon)Mandatory Pre-Bid Date: 
 N/ANon-Mandatory Pre-Bid: 
 A non-mandatory pre-bid conference and walk-through has been scheduled for 2/13/2025 at 2:00 p.m. The location
 of the conference will be at the softball field at 400 East 19th Street, Eugene, OR.Addenda: 
 4Document Uploads South Eugene Softball Field Drainage Repair Bid Tally Sheet - Final South Eugene Softball Field Drainage Repair Addendum #4 South Eugene Softball Field Drainage Repair Addendum #3 South Eugene Softball Field Drainage Repair Addendum No. 2 South Eugene High School Drainage Repair Addendum No. 1 South Eugene High School Softball Field Drainage Project Manual South Eugene Softball Field Drainage Repair Drawings Est. Const. Cost: 
 350KStatus: 
 AwardedAward Date: March 6, 2025 
 Contractor: Delta Construction
 Contract Amount: $318,000.0
 Completion Date: August 15, 2025Questions: Contact Project Manager, A.T. Marlar at marlar_a@4j.lane.edu Hard copies are not provided by the School District. It is the responsibility of all Prime Bidders, Sub-bidders, and Suppliers to obtain Bidding Documents and all Addenda from the hyperlink. It is important that all bidders correctly indicate all addenda on the bid form. 
- 
        NAME: 
 Multi-Site Painting 2025(Revised) Bid Due Date: 
 Wednesday, February 26, 2025 at 2:30 pmMandatory Pre-Bid Date: Revised Time 
 A mandatory pre-bid conference and walk-through has been scheduled for Tuesday, February 11, 2025 at 3:30
 p.m. The location of the conference will be in front of Gilham Elementary School, 3307 Honeywood Street,
 Eugene, OR.Addenda: 
 2Document Uploads Multi-Site Painting 2025 Preliminary Bid Results Multi-Site Painting 2025 Project Addendum 2 Multi-Site Painting 2025 Project Pre-Bid Sign In Sheet Multi-Site Painting 2025 Project Addendum 1 Multi-Site Painting 2025 Project Manual & Drawings Est. Const. Cost: 
 150KStatus: 
 ClosedAward Date: March 4, 2025 
 Contractor: Lindstrom Construction
 Contract Amount: $131,595.00
 Completion Date: August 15, 2025Questions: Contact Project Manager, A.T. Marlar at marlar_a@4j.lane.edu Hard copies of bid documents are not provided by the School District. It is the responsibility of all Prime Bidders, Sub-bidders, and Suppliers to obtain Bidding Documents and all Addenda from the hyperlink. It is important that all bidders correctly indicate all addenda on the bid form. 
- 
        NAME: 
 Multi-Site Building Repair 2025Revised Bid Due Date: 
 Wednesday, February 26, 2025 at 2:00 pm local timeMandatory Pre-Bid Date: 
 A mandatory pre-quote conference has been scheduled for Tuesday, February 11, 2025 at 3:30 p.m. starting at
 Gilham Elementary School, 3307 Honeywood Street, Eugene, OR.Addenda: 
 1Document Uploads Multi-Site Building Repair Final Bid Results Multi-Site Building Repair 2025 Addendum #1 Multi-Site Building Repair Pre-Bid Sign In Sheet 2.11.25 Multi-Site Building Repair 2025 Project Manual & Drawings Est. Const. Cost: 
 60KStatus: 
 AwardedAward Date: 
 Contractor: 2G Construction
 Contract Amount: $52,283.00
 Completion Date: July 1, 2025Questions: Contact Project Manager, A.T. Marlar at marlar_a@4j.lane.edu Hard copies are not provided by the School District. It is the responsibility of all Prime Bidders, Sub-bidders, and Suppliers to obtain Bidding Documents and all Addenda from the hyperlink. It is important that all bidders correctly indicate all addenda on the bid form. 
- 
        NAME: 
 Education Center HVAC Upgrades – Installation PhaseRevised Bid Due Date: 
 Thursday, February 27, 2025 at 2:00 p.m.Mandatory Pre-Bid Date: A mandatory pre-bid conference and walk-through has been scheduled for February 5, 2025 at 10:00 
 a.m. The conference location will be situated in front of the Education Center at 200 N. Monroe Street,
 Eugene, Oregon; please assemble outside the main entrance to the building. Statements made by the
 District’s representatives at the conference are not binding upon the District unless confirmed by Written
 Addendum. Pre-qualification of bidders is not required.Addenda: 
 3Document Uploads Ed Center HVAC Upgrade Preliminary Final Bid Results 2.27.25 Ed Center HVAC Upgrade Preliminary Bid Results 2.27.25 Education Center HVAC Upgrade Addendum No 3 Education Center HVAC Upgrade Addendum #2 Education Center HVAC Upgrade Addendum No. 1 Education Center HVAC Upgrade Project Manual Education Center HVAC Upgrade Combined Drawings Est. Const. Cost: 
 N/AStatus: 
 AwardedAward Date: March 4, 2025 
 Contractor: Harvey & Price
 Contract Amount: $263,424.00
 Completion Date: August 15, 2025Questions: Contact Project Manager, Kirk Gebb at gebb@4j.lane.edu The School District does not provide hard copies of bid documents. It is the responsibility of all Prime Bidders, Sub-bidders, and Suppliers to obtain Bidding Documents and all Addenda from the hyperlink. It is important that all bidders correctly indicate all addenda on the bid form. 
- 
        NAME: Multi-Site Security Fencing Project 2024 Revised Bid Due Date: Thursday, February 6, 2025 at 12:00 p.m. local time Mandatory Pre-Bid Date: 
 N/ANon-Mandatory Pre-Bid: January 15, 2025 at 1:30 p.m. The location of the conference will be Eugene School District 4J Facilities Management Office, 715 West Fourth Avenue, Eugene, Oregon 97402. Addenda: 
 2Document Uploads: Successful Bidder Bid Form: A B Utilities Contractors, Inc. First-Tier Subcontractor Disclosure: A B Utility Contractors Multi-Site Security Fencing Final Bid Results Multi-Site Security Fencing Project Addendum 2 Multi-Site Security Fencing Project Addendum 1 Multi-Site Security Fencing Pre-bid Conference Sign-in Sheet Multi-Site Security Fencing Project Manual Multi-Site Security Fencing Drawings Est. Const. Cost: 
 2.5 millionStatus: 
 AwardedAward Date: 2-12-2025 
 Contractor: AB Utilities Contractors, Inc.
 Contract Amount: $2,172,020
 Completion Date: 8-14-2025Questions: Contact Project Manager, Danny Palanuk, palanuk_d@4j.lane.edu Hard copies are not provided by the School District. It is the responsibility of all Prime Bidders, Sub-bidders, and Suppliers to obtain Bidding Documents and all Addenda from the hyperlink. It is important that all bidders correctly indicate all addenda on the bid form. 
- 
        NAME: Education Center HVAC Upgrades 
 NEW Bid Due Date: January 2, 2025 12:00 Noon 
 Mandatory Pre-Bid Date: 
 N/ANon-Mandatory Pre-Bid: 
 N/AAddenda: 
 1Document Uploads Education Center HVAC Upgrades Bid Tally Sheet - Final Education Center HVAC Upgrade Addendum One (1) Education Center HVAC Upgrade Project Manual Education Center HVAC Upgrade Drawings Est. Const. Cost: 
 N/AStatus: 
 AwardedAWARD DATE: January 9, 2025 
 CONTRACTOR: Johnson Barrow Oregon
 CONTRACT AMOUNT: $321,065.00
 COMPLETION DATE: TBDQuestions: Contact Project Manager, Kirk Gebb at gebb@4j.lane.edu Hard copies are not provided by the School District. It is the responsibility of all Prime Bidders, Sub-bidders, and Suppliers to obtain Bidding Documents and all Addenda from the hyperlink. It is important that all bidders correctly indicate all addenda on the bid form. 
- 
        NAME: 
 Kelly Middle School Roof Replacement Project 2025Award Date: January 9, 2025 
 Contractor: McDonald & Wetle
 Contract Amount: $1,103,600.0
 Completion Date: August 22, 2025Bid Due Date: 
 NEW BID DATE: Thursday, December 5, 2024 at 12:00 PM (Noon)Mandatory Pre-Bid Date: Non-Mandatory Pre-Bid: 
 Monday, November 11, 2024, at 11 AM. The location of the conference will be in front of the school at 850 Howard Avenue, Eugene, OR 97404Addenda: 3 Document Uploads Final Bid Results Kelly Middle School Roof Replacement Preliminary Bid Results for Kelly Middle School Roof Replacement Project Kelly MS Roof Replacement Addendum No. 3 Kelly MS Roof Replacement Addendum No. 2 Kelly MS Roof Replacement Addendum No. 1 Kelly MS Roof Pre-Bid Meeting Sign-In Sheet Kelly MS Roof Replacement Project Manual Kelly MS Roof Replacement Drawings Est. Const. Cost: 
 1.1 millionStatus: 
 AwardedAward Date: January 9, 2025 
 Contractor: McDonald & Wetle
 Contract Amount: $1,103,600.00
 Completion Date: August 22, 2025Questions: Contact CIP@4j.lane.edu Hard copies are not provided by the School District. It is the responsibility of all Prime Bidders, Sub-bidders, and Suppliers to obtain Bidding Documents and all Addenda from the hyperlink. It is important that all bidders correctly indicate all addenda on the bid form. 
- 
        NAME: Request for Proposals (RFP) for Security Patrol and Alarm Response Service / RFP 25-412 Proposal Due Date and Time: November 7, 2024 2:00 PM Electronic submissions only (see RFP document for complete details) Description: The Lane County School District 4J is requesting proposals from qualified Security Firms to provide District-Wide Security and Fire Alarm Response to 40 District Facilities. Document Uploads Security Patrol and Alarm Response Service RFP Document Security Patrol and Alarm Response Service Addendum 1 Addendums: 1 Status: Open Questions: Contact Belinda Wilton at wilton@4j.lane.edu Hard copies are not provided by the School District. It is the responsibility of all Proposers to obtain RFP Documents from the above Document Uploads hyperlink. 
 
                         Additional settings for Safari Browser.
                        