Home » News » Technology » Network Maintenance » NS Planned Maintenance: February 25, 2017

NS Planned Maintenance: February 25, 2017

4J Network Services is scheduling work replacing switches at Madison Middle School (2/25/2017) during the day.   This work will be done between 8am and 5pm by school district staff.  The work will likely involve periods of telephone system and data network downtime and/or interruptions.   There is always the risk of extended outages during this time if things don’t go as planned.

2/28/2017

  • Madison Middle School Switch replacement was completed as planned.
This entry was posted in Network Maintenance. Bookmark the permalink. Both comments and trackbacks are currently closed.